1.Project: Ankara 4 Afghan Refugee School, Turkye
2.Budget: 25,000,000 KRW
3.Construction Period:
4.Fundraising Period:
5.Sponsor:

1.Project: Ankara 4 Afghan Refugee School, Turkye
2.Budget: 25,000,000 KRW
3.Construction Period:
4.Fundraising Period:
5.Sponsor: